Employee Suggestion Top
Employee Suggestion Program
bottom part of logo
 Suggest
 Bullet Point Suggestion Form (pdf)
 Bullet Point Evaluation/Summary Form (pdf)
 Bullet Point Process

 Awards
 Bullet Point Criteria
 Bullet Point Regular Award Winners
 Bullet Point Annual Winners

 News/Info
 Bullet Point Meetings/Events
 Bullet Point Success
 Bullet Point Promotional Materials
 Bullet Point History Archive

 Contacts
 Bullet Point Agency & Campus Coordinators
 Bullet Point State Board

 Home

 
Enter Keyword:
 Vertical Line 
Return to Meetings/Events   —  Return to Previous

Horizontal Line
Print Print Version
Board Meeting - March 21, 2006
Horizontal Line

Meeting Summary - Employee Suggestion Board
March 21, 2006
10:30 am - 11:10 am
Investment Board, 121 East Wilson Street, Madison, WI

PRESENT:

Board Members:    James Behrend, Board Chair; Sandy Drew, Member; David Vriezen, Member
OSER Staff:   Robert Toomey, Statewide Program Coordinator

REGULAR  BUSINESS:

NEW SUGGESTIONS:

The Board reviewed and decided on the following regular employee suggestions:

Number Name & Agency Suggestion Description & Benefits Board Decision

FY06-08

Glenn Saeger, DOT/DTD

Add the STAR web address to STAR posters and brochures.

Certificate

FY06-09

Tony Johnson, DVA

Created design concept, assembly and completion of casket carriers for Northern and Southern Veterans Cemeteries. The completed casket carriers fulfilled the Cemetery Director expectations, and are functional and visually acceptable. The work requirements included a metal enclosure to accommodate moving a casket, permanently attached to the frame of a utility vehicle, to rotate a minimum of 90 degrees with inside rollers and a roll-up rear door. After assembly was completed, painting and graphics were completed by an outside vendor so the casket carrier would represent the cemetery and ensure the dignity and respect that moving a veteranís casket would require. Net Cost Savings:  Total, $33.853.00.  Average annual savings:  $6,770.

Certificate and Cash Award of $135.00

FY06-10

Danny Dahle, UW-La Crosse

After several heavy rains and building floods, Mr. Dahle worked outside of the scope of his position to install a six-foot standing pipe on the existing pipe so that water would not enter the building. Since the time the pipe was installed, the building has not experienced any flooding. Savings: Potential savings of $10,000 (average annual $2,000).

Certificate and Special Cash Award of $50.00


UPDATES:

Drew and Toomey reported on a recent presentation made to the Deputy Secretaries to promote more agencies getting involved with the State Employee Suggestion Program. It also included a presentation by Jim Becker of DOT on the things DOT does to build a successful program at the agency level.

Toomey reported on a meeting with two staff from DNR who are eager to get their agency active with the State Employee Suggestion Program.

Toomey also reported on a recent open records request and historical archive information about the program that he copied at the State Historical Society, and scanned to the web site, where it can be viewed at the History Archive page.

NEXT MEETING:

The next meeting will be sometime during the summer, likely June or July, and will be announced in advance.

Return to Meeting Summaries page


Horizontal Line
Last Modified:  4/23/2007 11:28:22 AM
Horizontal Line
Return to Meetings/Events   —  Return to Previous


Horizontal Line